A lot of electrical cable was used to connect from the Control Shelter to the decoy fire baskets and lightning and provide power from the generator. To reduce voltage drop over the distances involved the cable was 'heavy' and suitable for external surface use. At least one and probably two qualified electricians were assigned to cover the shifts on a QL site and maintain serviceability.


Reply With Quote

Bookmarks